More About Jester Blvd.
We had just finished getting the entire length of the boulevard built from bottom to top, the base was laid and tested, the curbs were all in, all we needed to do was put the asphalt down when the Memorial Day Flood of 1981 hit Austin. During the course of that one night and day, the torrents of water that came down, coupled with the extreme steep grades, we saw 3500 tons of limestone flex-base disappear from that hill. To give you an idea of how much that is, it took 150 large 18 wheeler loads to replace it. In … Continue reading More About Jester Blvd.